Darkroom Renovation Phase II Started

Darkroom Renovation Phase 2 No 1 by Nokton48, on Flickr

Starting with Phase 2 of this project. I have a contractor doing the work for me, I can input ideas and he runs with them and sometimes makes my ideas even better.

Adding new drainage, New inputs with two more sink units, my green Kreonite, and a 3D printed yellow plastic water factory containment unit, meant to hold two 55 gallon drums filled with oil or chemicals. Installing a drain and putting my 16x20 fibre print washer in there.

A lot of progress on this will happen today.

This area will be for film development, film and print washing and drying. To the right is the entrance to the Darkroom Phase I you can see here:

https://www.rangefinderforum.com/for...oom+renovation
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 4 Days Ago   #2
Bill Clark
Registered User
 
Bill Clark's Avatar
 
Bill Clark is offline
Join Date: Dec 2004
Location: Minnetonka, Minnesota
Age: 71
Posts: 2,615
It’s starting to look like a darkroom!
__________________
Predictions are hard, especially about the future.”
-Yogi Berra
  Reply With Quote

Old 4 Days Ago   #3
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Darkroom Renovation Phase 2 No 2 by Nokton48, on Flickr
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 4 Days Ago   #4
mbisc
Silver Halide User
 
mbisc's Avatar
 
mbisc is offline
Join Date: Mar 2006
Location: Phoenix, AZ
Posts: 641
Green with Envy
__________________
Mike

----------------------------------------------------------------
Life is too short for cheap film

Flickr
----------------------------------------------------------------
  Reply With Quote

Old 3 Days Ago   #5
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Darkroom Renovation Phase 2 No 3 by Nokton48, on Flickr

Sink drains installed today. Tomorrow hopefully will finish plumbing and continue on with carpentry which goes quickly. Two rows of wire shelves will be added to the wall above the sinks.


Darkroom Sink Finally Plumbed 2 by Nokton48, on Flickr

E3 Finally Installed by Nokton48, on Flickr

Here's the other side of the darkroom started a year ago.
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 3 Days Ago   #6
Saul
fighting inertia
 
Saul's Avatar
 
Saul is offline
Join Date: Dec 2010
Location: Baltimore MD
Posts: 506
Looking good but couldn't help noticing the outlet in the first picture. Shouldn't that be a GFI outlet since it's near water?

No need to get hurt in the darkroom!
  Reply With Quote

Old 3 Days Ago   #7
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Hi Saul,

Yes our electrician is going to re-do the wiring to both rooms with CFI (on that wall re-doing the outlets; I want as many as possible), as well as adding additional enhancements.
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 3 Days Ago   #8
MrFujicaman
Registered User
 
MrFujicaman is online now
Join Date: Apr 2012
Age: 62
Posts: 737
Quote:
Originally Posted by Saul View Post
Looking good but couldn't help noticing the outlet in the first picture. Shouldn't that be a GFI outlet since it's near water?

No need to get hurt in the darkroom!
Saul's right-those need to be GFI outlets as per National Electrical Code.

If you want them, I have some bought for an aborted project-they're beige but, sealed in the package. Yours for the shipping, Dan!
  Reply With Quote

Old 3 Days Ago   #9
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Hello MFM,

PM sent regarding electrical outlets.
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 2 Days Ago   #10
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Darkroom Renovation Phase 2 No 4 by Nokton48, on Flickr

The Kreonite Green Plate Washing Sink, and the Yellow 55 gallon drum Water Containment unit are now completely hooked up, as you can see the water is finally running. The yellow sink will hold my Calumet 16x20 Archival Fibre Print Washer. The electrician will come in after we are done with all the plumbing and carpentry.

Tomorrrow my Guy will finish the carpentry on the two new sinks, and start on building a base for my 5x7 Omega E3 Enlarger, with multiple store shelves under the unit. And hook up the odor removal system which will vent chemical odors from the other side (that's in the room with the enlargers and print developing sink).

I love it when a plan starts to come together.
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 4 Hours Ago   #11
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Darkroom Renovation Phase 2 No 5 by Nokton48, on Flickr

Here's how it looks as of end of yesterday. Not done but getting closer, sinks finished being roughed in, shelves underneath. Backstop behind the yellow sink to store things and keep things from falling behind. Today I'll place my 16x20 Calumet Archival Print Washer and fire it up to check water flows.

Also my Electrician came in and installed three CFI double outlet sets, so now I have twelve plugs in this area all CFI. Also a new 150 CFM celing fan was installed to pull odors from the darkroom trays in the other room. Hope to hook that up today; We will see.......

Wire shelves should be attached to concrete block rear wall. So we are getting there slowly.
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 4 Hours Ago   #12
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Darkroom Renovation Phase 2 No 6 by Nokton48, on Flickr

Also my Contractor built this Omega Automega E3 5x7 Enlarging table to my design and specs. This is similar to the Omega E3/E4 tables that I have seen on the internet. I am pleased, also note the storage underneath

Also note Mr. Al Kaplan looks down from above and hopefully approves..............
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote

Old 1 Hour Ago   #13
Nokton48
Registered User
 
Nokton48's Avatar
 
Nokton48 is offline
Join Date: Dec 2006
Posts: 5,474
Darkroom Renovation Phase 2 No 7 by Nokton48, on Flickr

Here you can see I have finally hooked up my 16x20 Calumet Archival B&W Fiber Print Washer and it is running just fine, no leaks anywhere.
__________________
“The secret of getting ahead is getting started.”
― Mark Twain
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -8. The time now is 14:38.


vBulletin skin developed by: eXtremepixels
Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.

All content on this site is Copyright Protected and owned by its respective owner. You may link to content on this site but you may not reproduce any of it in whole or part without written consent from its owner.